Hero Hoists Side by Side Parker Installation Part 3
The Hoist is almost operational! The only thing left is to get the unlocking mechanism working. In part two I installed the motor and hydraulic lines. Yesterday an electrician connected up the hoist for me. After fixing a minor hydraulic leak I had a working hoist (sans unlock rod). This is timely as I needed to get the 560SEC inside. While the unlock rod...




















