Hero Hoists Side by Side Parker Installation Part 4
The Hero Hoists Side by Side Parker is now installed and fully operational. The locking mechanism is now working, and I have put the E-Type on top. In the last part, I had the electrical connection hooked up and did the final adjustment. The challenge I had with the locking mechanism was that a 1M rod needed to be installed from the rear of...





















